The Art of Building the Wrong Things
The Art of Building the Wrong Things
“We continue to build what can wait
while neglecting what cannot. Somewhere between planning and execution, public
priorities lose their way.”
Peerzada Mohsin Shafi
Jammu and Kashmir has witnessed considerable infrastructure
development, with roads, bridges, public buildings and other facilities being
constructed across the Union Territory. Such investment is essential in a
region where difficult terrain, harsh winters and geographical constraints make
connectivity and public services particularly important. Yet the value of
development cannot be measured by the number of structures built. It must be
judged by whether public investments address genuine needs and improve people's
lives. Too often, the urgency of a project appears less important than the
ability to execute it.
The problem is not infrastructure development itself, but the
priorities guiding it. A structure may look impressive upon completion, yet its
real worth lies in the problem it solves. When a facility remains largely
unused while an essential project stays incomplete for years, concerns arise
over whether public money has been directed towards the most pressing needs.
In Anantnag, an overhead footbridge was reportedly constructed
within a short period, yet it appears to have little utility, with pedestrians
rarely seen using it. Meanwhile, the upgradation of a nearby motorable bridge,
where limited space makes it difficult for vehicles travelling in opposite
directions to pass smoothly, has reportedly remained pending for years. The
contrast illustrates a wider concern about how competing infrastructure needs
are prioritised. Although the two structures serve different purposes, the
situation highlights the importance of assessing actual demand, existing
bottlenecks and expected public benefits before committing funds. A project
should not be considered successful merely because it has been completed
quickly.
The issue extends beyond a single location. Across towns and
villages, infrastructure priorities should reflect the urgency of the problem,
the number of people affected and the benefits an investment is expected to
deliver. Beautification projects, decorative fountains and ornamental
installations can improve public spaces, but their value becomes questionable
when they fall into disrepair while drainage, road maintenance, water supply
and other essential services continue to demand attention. Such projects are
not inherently wasteful. However, their justification, maintenance costs and
public benefits deserve the same scrutiny as any other expenditure.
The consequences of poor prioritisation are also visible in
official audit findings. In its Composite Audit Report on Jammu and Kashmir,
the Comptroller and Auditor General of India examined projects funded under the
Central Road and Infrastructure Fund. The report recorded that 93 existing road
projects remained incomplete while 84 new projects were sanctioned between 2017
and 2019. Of those new projects, 82 were also incomplete by March 2022. The CAG
noted that ₹228.36 crore released for the new projects could have been used to
execute and complete the existing 93 projects and identified inadequate
prioritisation as a contributing factor. This does not mean that every new
project was unnecessary. It does, however, demonstrate how inadequate
sequencing and competing commitments can leave public works unfinished while
available resources remain stretched.
Another concern emerged from a report published in January 2022,
which stated that a departmental exercise had identified nearly 2,000 abandoned
school buildings across Jammu and Kashmir reportedly constructed without an
actual requirement. The figure and the circumstances surrounding these
buildings warrant examination through the original departmental records. If
public buildings were constructed without adequately establishing demand, the
resulting expenditure would reflect a failure to connect planning with actual
service requirements. Infrastructure is not an achievement simply because a
building stands on the ground. Its value depends on whether it serves a genuine
purpose.
This distinction is central to responsible public spending. A
project can be technically feasible, financially sanctioned and successfully
constructed without representing the best use of public money. Technical
feasibility establishes whether something can be built. It does not establish
whether it should be built, whether it is needed at that location or whether it
deserves priority over competing requirements.
Every significant infrastructure proposal should therefore begin
with a clearly identified public problem supported by evidence. Departments
should assess existing facilities, establish the scale of demand, estimate the
number of beneficiaries and examine alternative solutions. Where appropriate,
upgrading an existing bridge should be evaluated alongside constructing a new
one. A public building should be justified by actual demand, while a
beautification project should be assessed against competing civic needs and its
long-term maintenance costs. The objective should be to select the option that
delivers the greatest public benefit, not simply the option that is easiest to
approve or execute.
International practices offer useful lessons. The United Kingdom's
Green Book requires public spending proposals to consider objectives, costs,
benefits and alternative options. Norway's State Project Model incorporates
independent quality assurance for major investments. Jammu and Kashmir could
adapt these principles to strengthen the appraisal of significant public
projects. Proposals should demonstrate a clear need, compare feasible
alternatives and account for long term costs before approval.
Scrutiny must also continue during construction. Delays, cost
escalation, design changes and missing connecting infrastructure can undermine
even a well-planned project. Before work begins, authorities should ensure that
designs are finalised, land and statutory permissions are secured, funding is
realistically available and essential components are planned together.
Significant changes in cost, scope or timelines should trigger a documented
review. Public accountability should not end once a contract is awarded or a
foundation stone is laid.
Equally important is an assessment after completion. Every
significant public infrastructure project should be evaluated to establish
whether it is being used, whether it has achieved its stated purpose and
whether the benefits justify the expenditure. Assessments should examine actual
usage, service quality, accessibility, safety and maintenance. Where a facility
remains underused, the reasons should be investigated. Poor design,
inconvenient access, changing demand or inadequate public awareness may explain
the outcome. Where evidence shows that the original need was misjudged,
corrective action and accountability should follow.
Transparency can make this process more effective. Jammu and
Kashmir would benefit from a public register of infrastructure projects
disclosing their purpose, estimated cost, funding source, approval date,
expected completion date and current status. Completed projects should include
basic information about operational performance and maintenance. Where a new
project is prioritised while an older and more urgent work remains incomplete,
the department concerned should explain the decision publicly. District level
priority registers could further identify unsafe bridges, damaged roads,
drainage failures, water shortages and incomplete essential connections
according to public safety, the number of people affected and the consequences
of delay. New proposals should be assessed against these priorities before
funds are committed.
The aim is not to discourage construction or dismiss every project
that attracts limited use. Some infrastructure provides benefits that are not
immediately visible, while beautification also has a legitimate place in public
development. The requirement is a system in which decisions are evidence based,
alternatives are compared, priorities are explained and outcomes are
independently assessed. In a region facing substantial geographical and
infrastructural challenges, misplaced priorities carry a real opportunity cost.
Completing a critical road, improving drainage or upgrading an existing bridge
may sometimes deliver greater immediate benefit than a more conspicuous
project.
Development cannot be measured simply by the number of structures
built, the value of contracts awarded or the projects inaugurated. It must be
measured by safer travel, better access to essential services and tangible
improvements in everyday life. Every major investment should have a clearly
established public purpose and should be able to demonstrate why it deserved
priority.
Jammu and Kashmir does not merely need more infrastructure. It
needs stronger scrutiny before construction, accountability during execution
and honest evaluation after completion. The true measure of progress is not how
quickly a structure rises, but how meaningfully it serves the public.
Because the real art of development lies not in building more, but
in knowing what matters most.